Cargando…

Summary of the Evian beam commissioning workshop

An LHC beam commissioning workshop was held on the 19-20 January 2010. The goal of this workshop is to review the 2009 LHC beam commissioning and beam operations experience, and to look forward to the continued commissioning and operation of the LHC with beam in 2010. Beam related experiences from i...

Descripción completa

Detalles Bibliográficos
Autor principal: Lamont, M
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1281644
_version_ 1780920479114067968
author Lamont, M
author_facet Lamont, M
author_sort Lamont, M
collection CERN
description An LHC beam commissioning workshop was held on the 19-20 January 2010. The goal of this workshop is to review the 2009 LHC beam commissioning and beam operations experience, and to look forward to the continued commissioning and operation of the LHC with beam in 2010. Beam related experiences from injection to stable beams were discussed. Issues addressed covered the measurements and observations versus expectations; problems encountered; the performance of software and controls; and necessary improvements. The readiness for 3.5 TeV running was also covered. As an outcome, the workshop proposed a 2010 beam re-commissioning plan for 3.5 TeV operation. This plan addresses the strategies for increasing the beam energy, intensity and specific and integrated luminosity to the targets required for 2010.
id cern-1281644
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2010
record_format invenio
spelling cern-12816442021-09-14T11:41:58Zhttp://cds.cern.ch/record/1281644engLamont, MSummary of the Evian beam commissioning workshopAccelerators and Storage RingsAn LHC beam commissioning workshop was held on the 19-20 January 2010. The goal of this workshop is to review the 2009 LHC beam commissioning and beam operations experience, and to look forward to the continued commissioning and operation of the LHC with beam in 2010. Beam related experiences from injection to stable beams were discussed. Issues addressed covered the measurements and observations versus expectations; problems encountered; the performance of software and controls; and necessary improvements. The readiness for 3.5 TeV running was also covered. As an outcome, the workshop proposed a 2010 beam re-commissioning plan for 3.5 TeV operation. This plan addresses the strategies for increasing the beam energy, intensity and specific and integrated luminosity to the targets required for 2010.oai:cds.cern.ch:12816442010
spellingShingle Accelerators and Storage Rings
Lamont, M
Summary of the Evian beam commissioning workshop
title Summary of the Evian beam commissioning workshop
title_full Summary of the Evian beam commissioning workshop
title_fullStr Summary of the Evian beam commissioning workshop
title_full_unstemmed Summary of the Evian beam commissioning workshop
title_short Summary of the Evian beam commissioning workshop
title_sort summary of the evian beam commissioning workshop
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1281644
work_keys_str_mv AT lamontm summaryoftheevianbeamcommissioningworkshop