Cargando…
A 120 mm Bore Quadrupole for the Phase 1 LHC Upgrade
The phase I LHC upgrade foresees the installation of a new final focusing for the high luminosity experiences in order to be able to focus the beams in the interaction points to b*~ 0.25 cm. Key element of this upgrade is a large bore (120 mm) superconducting quadrupole. This article proposes a magn...
Autores principales: | Fessia, P, Granieri, P P, Borgnolutti, F, Regis, F, Richter, D, Todesco, E |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2010.2043658 http://cds.cern.ch/record/1282402 |
Ejemplares similares
-
Electromagnetic Design of the 120 mm Aperture Quadrupole for the LHC Phase One Upgrade
por: Borgnolutti, F, et al.
Publicado: (2009) -
Design of a 120 mm Bore 15 T Quadrupole for the LHC Upgrade Phase II
por: Caspi, S, et al.
Publicado: (2010) -
130 mm Aperture Quadrupoles for the LHC Luminosity Upgrade
por: Todesco, E, et al.
Publicado: (2007) -
Quench Performance of HQ01, a 120 mm Bore LARP Quadrupole for the LHC Upgrade
por: Marchevsky, M, et al.
Publicado: (2012) -
LHC IR Upgrade Nb-Ti, 120mm Aperture Model Quadrupole Test Results at 1.8K
por: Kirby, G A, et al.
Publicado: (2014)