Kick response measurements during LHC injection tests and early LHC Beam commissioning

The transfer lines from the SPS to the LHC, TI 2 and TI 8, with a total length of almost 6 km are the longest ones in the world. For that reason even small systematic optics errors are not negligible because they add up and result in an injection mismatch in the LHC. Next to other lattice measuremen...

Descripción completa

Detalles Bibliográficos
Autores principales: Fuchsberger, K, Fartoukh, S, Goddard, B, Kain, V, Meddahi, M, Schmidt, F, Wenninger, J
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1287605
_version_ 1780920619972427776
author Fuchsberger, K
Fartoukh, S
Goddard, B
Kain, V
Meddahi, M
Schmidt, F
Wenninger, J
author_facet Fuchsberger, K
Fartoukh, S
Goddard, B
Kain, V
Meddahi, M
Schmidt, F
Wenninger, J
author_sort Fuchsberger, K
collection CERN
description The transfer lines from the SPS to the LHC, TI 2 and TI 8, with a total length of almost 6 km are the longest ones in the world. For that reason even small systematic optics errors are not negligible because they add up and result in an injection mismatch in the LHC. Next to other lattice measurement methods Kick-response measurements were the most important sources of information during the early phases of beam commissioning of these transfer lines and the LHC ring. This measurement technique was used to verify orbit-corrector and BPM gains as well as to sort out optics errors. Furthermore fits to off-momentum kick response turned out to be an appropriate method to establish a model for systematic errors of the transfer line magnets. This paper shortly describes the tools and methods developed for the analysis of the taken data and presents the most important results of the analysis.
id cern-1287605
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2010
record_format invenio
spelling cern-12876052022-08-17T13:25:47Zhttp://cds.cern.ch/record/1287605engFuchsberger, KFartoukh, SGoddard, BKain, VMeddahi, MSchmidt, FWenninger, JKick response measurements during LHC injection tests and early LHC Beam commissioningAccelerators and Storage RingsThe transfer lines from the SPS to the LHC, TI 2 and TI 8, with a total length of almost 6 km are the longest ones in the world. For that reason even small systematic optics errors are not negligible because they add up and result in an injection mismatch in the LHC. Next to other lattice measurement methods Kick-response measurements were the most important sources of information during the early phases of beam commissioning of these transfer lines and the LHC ring. This measurement technique was used to verify orbit-corrector and BPM gains as well as to sort out optics errors. Furthermore fits to off-momentum kick response turned out to be an appropriate method to establish a model for systematic errors of the transfer line magnets. This paper shortly describes the tools and methods developed for the analysis of the taken data and presents the most important results of the analysis.CERN-ATS-2010-185oai:cds.cern.ch:12876052010-05-30
spellingShingle Accelerators and Storage Rings
Fuchsberger, K
Fartoukh, S
Goddard, B
Kain, V
Meddahi, M
Schmidt, F
Wenninger, J
Kick response measurements during LHC injection tests and early LHC Beam commissioning
title Kick response measurements during LHC injection tests and early LHC Beam commissioning
title_full Kick response measurements during LHC injection tests and early LHC Beam commissioning
title_fullStr Kick response measurements during LHC injection tests and early LHC Beam commissioning
title_full_unstemmed Kick response measurements during LHC injection tests and early LHC Beam commissioning
title_short Kick response measurements during LHC injection tests and early LHC Beam commissioning
title_sort kick response measurements during lhc injection tests and early lhc beam commissioning
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1287605
work_keys_str_mv AT fuchsbergerk kickresponsemeasurementsduringlhcinjectiontestsandearlylhcbeamcommissioning
AT fartoukhs kickresponsemeasurementsduringlhcinjectiontestsandearlylhcbeamcommissioning
AT goddardb kickresponsemeasurementsduringlhcinjectiontestsandearlylhcbeamcommissioning
AT kainv kickresponsemeasurementsduringlhcinjectiontestsandearlylhcbeamcommissioning
AT meddahim kickresponsemeasurementsduringlhcinjectiontestsandearlylhcbeamcommissioning
AT schmidtf kickresponsemeasurementsduringlhcinjectiontestsandearlylhcbeamcommissioning
AT wenningerj kickresponsemeasurementsduringlhcinjectiontestsandearlylhcbeamcommissioning