Kick response measurements during LHC injection tests and early LHC Beam commissioning
The transfer lines from the SPS to the LHC, TI 2 and TI 8, with a total length of almost 6 km are the longest ones in the world. For that reason even small systematic optics errors are not negligible because they add up and result in an injection mismatch in the LHC. Next to other lattice measuremen...
Autores principales: | Fuchsberger, K, Fartoukh, S, Goddard, B, Kain, V, Meddahi, M, Schmidt, F, Wenninger, J |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1287605 |
Ejemplares similares
-
Beam commissioning of injection into the LHC
por: Mertens, V, et al.
Publicado: (2009) -
Determination of the Chromaticity of the TI 8 Transfer Line Based on Kick Response Measurements
por: Fuchsberger, K, et al.
Publicado: (2009) -
Machine studies during beam commissioning of the SPS-to-LHC transfer lines
por: Meddahi, M, et al.
Publicado: (2009) -
Beam Commissioning of the Injection Protection System of the LHC
por: Bartmann, W, et al.
Publicado: (2010) -
Operational experience during initial beam commissioning of the LHC
por: Fuchsberger, K, et al.
Publicado: (2010)