Cargando…

ATLAS trigger and data acquisition: Capabilities and commissioning

The ATLAS trigger system is based on three levels of event selection that selects the physics of interest from an initial bunch crossing rate of 40 MHz to an output rate of View the MathML source compatible with the offline computing power and storage capacity. During nominal LHC operations at a lum...

Descripción completa

Detalles Bibliográficos
Autor principal: Scannicchio, D A
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:https://dx.doi.org/10.1016/j.nima.2009.06.114
http://cds.cern.ch/record/1290345
Descripción
Sumario:The ATLAS trigger system is based on three levels of event selection that selects the physics of interest from an initial bunch crossing rate of 40 MHz to an output rate of View the MathML source compatible with the offline computing power and storage capacity. During nominal LHC operations at a luminosity of View the MathML source, decisions must be taken every 25 ns. The LHC is expected to begin operations with a peak luminosity of View the MathML source with far fewer number of bunches, but quickly ramp up to higher luminosities. Hence, the ATLAS Trigger and Data Acquisition system needs to adapt to the changing beam conditions preserving the interesting physics and detector requirements that may vary with these conditions.