Cargando…

Commissioning status of the decelerator test beam line in CTF3

The CLIC Test Facility (CTF3) at CERN was constructed by the CTF3 collaboration to study the feasibility of the concepts for a compact linear collider. The test beam line (TBL) recently added to the CTF3 machine was designed to study the CLIC decelerator beam dynamics and 12 GHz power production. Th...

Descripción completa

Detalles Bibliográficos
Autores principales: Adli, E, Döbert, S, Lillestol, R, Olvegaard, M, Syratchev, I, Carrillo, D, Toral, F, Faus-Golfe, A, Garcia-Garrigos, J J, Kubyshin, Y, Montoro, G
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1302729