Cargando…
Commissioning status of the decelerator test beam line in CTF3
The CLIC Test Facility (CTF3) at CERN was constructed by the CTF3 collaboration to study the feasibility of the concepts for a compact linear collider. The test beam line (TBL) recently added to the CTF3 machine was designed to study the CLIC decelerator beam dynamics and 12 GHz power production. Th...
Autores principales: | Adli, E, Döbert, S, Lillestol, R, Olvegaard, M, Syratchev, I, Carrillo, D, Toral, F, Faus-Golfe, A, Garcia-Garrigos, J J, Kubyshin, Y, Montoro, G |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1302729 |
Ejemplares similares
-
Electron beam deceleration measurements using the decelerator test beam line in the Compact Linear Collider test facility
por: Lillestøl, R L, et al.
Publicado: (2014) -
Experimental Program for the CLIC test facility 3 test beam line
por: Adli, E, et al.
Publicado: (2010) -
Progress on the CTF3 Test Beam Line
por: Döbert, Steffen, et al.
Publicado: (2006) -
Deceleration Measurements of an Electron Beam in the CLIC Test Facility 3
por: Lillestøl, Reidar, et al.
Publicado: (2014) -
Achievements in CTF3 and Commissioning status
por: Bettoni, S, et al.
Publicado: (2009)