Cargando…

Measuring the longitudinal bunch profile at CTF3

The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration in order to test the feasibility of the proposed Compact Linear Collider (CLIC) two-beam acceleration scheme. The monitoring and control of the bunch length throughout the CTF3 complex is important sinc...

Descripción completa

Detalles Bibliográficos
Autores principales: Dabrowski, A E, Adli, E, Bettoni, S, Braun†, H H, Corsini, R, Döbert, S, Egger, D, Lefevre, T, Rabiller, A, Shaker, H, Soby, L, Skowronski, P K, Tecker, F, Velasco, M
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1302735
Descripción
Sumario:The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration in order to test the feasibility of the proposed Compact Linear Collider (CLIC) two-beam acceleration scheme. The monitoring and control of the bunch length throughout the CTF3 complex is important since this affects the efficiency and the stability of the final RF power production process. Bunch length diagnostics therefore form an essential component of the beam instrumentation at CTF3. This paper presents longitudinal profile measurements based on Streak camera and non-destructive RF power and microwave spectrometry techniques.