LHCb commissioning and readiness for first data
LHCb has been installed by spring 2008, followed by intensive testing and commissioning of the system in order to be ready for first data taking. Despite the horizontal geometry of the LHCb detector it was possible to collect over one million useful cosmic events that allowed a first time alignment...
Autor principal: | Voss, Helge |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1302758 |
Ejemplares similares
-
Production, Commissioning and "First Data" of the LHCb Silicon Tracker
por: Voss, Helge
Publicado: (2008) -
LHCb Commissioning
por: Deplano, C
Publicado: (2010) -
LHCb Commissioning
por: Monteil, Stephane
Publicado: (2008) -
LHCb commissioning
por: Callot, Olivier
Publicado: (2008) -
LHCb commissioning
por: Dettori, F
Publicado: (2009)