Cargando…
Summary of the abort gap cleaning tests performed on October 18, 2010
After the first encouraging tests performed in 2009, machine time was allocated in 2010 to continue the commissioning of the abort gap cleaning systems. This note summarises the test performed in October 2010 at 450 GeV, using the vertical damper system in order to clean the particles located in the...
Autores principales: | Bart Pedersen, S, Boccardi, A, Jeff, A, Roncarolo, F, Hofle, W, Shaposhnikova, E, Valuch, D, Kain, V, Bracco, C, Goddard, B, Meddahi, M, Uythoven, J, Gianfelice, E |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1304273 |
Ejemplares similares
-
Summary of Injection pre-cleaning tests performed on October 27, 2010
por: Boccardi, A, et al.
Publicado: (2010) -
Summary of the abort gap cleaning tests performed on October 18, 2010
por: Boccardi, A, et al.
Publicado: (2010) -
Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011
por: Boccardi, A, et al.
Publicado: (2011) -
Abort Gap Cleaning tests performed on 13 October 2011 during luminosity operation
por: Boccardi, A, et al.
Publicado: (2012) -
LHC abort gap cleaning studies during luminosity operation
por: Bartmann, W, et al.
Publicado: (2012)