Cargando…

CCDTL Power Splitting

In the final version of the powering scheme for Linac4, it is foreseen to have four klystrons for the 7 modules of the CCDTL. In this note we report the possible configurations that can be set with the four klystrons and its impact on the beam dynamics performances.

Detalles Bibliográficos
Autores principales: Posocco, P, Garcia Tudela, M, Lombardi, A
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1306148
_version_ 1780921146882916352
author Posocco, P
Garcia Tudela, M
Lombardi, A
author_facet Posocco, P
Garcia Tudela, M
Lombardi, A
author_sort Posocco, P
collection CERN
description In the final version of the powering scheme for Linac4, it is foreseen to have four klystrons for the 7 modules of the CCDTL. In this note we report the possible configurations that can be set with the four klystrons and its impact on the beam dynamics performances.
id cern-1306148
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2010
record_format invenio
spelling cern-13061482019-09-30T06:29:59Zhttp://cds.cern.ch/record/1306148engPosocco, PGarcia Tudela, MLombardi, ACCDTL Power SplittingAccelerators and Storage RingsIn the final version of the powering scheme for Linac4, it is foreseen to have four klystrons for the 7 modules of the CCDTL. In this note we report the possible configurations that can be set with the four klystrons and its impact on the beam dynamics performances.sLHC-Project-Note-0024CERN-sLHC-Project-Note-0024oai:cds.cern.ch:13061482010-11-10
spellingShingle Accelerators and Storage Rings
Posocco, P
Garcia Tudela, M
Lombardi, A
CCDTL Power Splitting
title CCDTL Power Splitting
title_full CCDTL Power Splitting
title_fullStr CCDTL Power Splitting
title_full_unstemmed CCDTL Power Splitting
title_short CCDTL Power Splitting
title_sort ccdtl power splitting
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1306148
work_keys_str_mv AT posoccop ccdtlpowersplitting
AT garciatudelam ccdtlpowersplitting
AT lombardia ccdtlpowersplitting