Cargando…
Commissionning of the EMMA non-scaling FFAG
EMMA is the world's first non-scaling fixed field alternating gradient accelerator and is being constructed at the STFC Daresbury Laboratory. Experience from the initial commissioning phases (from early 2010) will be reported and lessons for future machines of a similar type will be discussed....
Autor principal: | Edgecock, R |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1306171 |
Ejemplares similares
-
The EMMA Non-scaling FFAG
por: Edgecock, Thomas, et al.
Publicado: (2010) -
FIRST COMMISSIONING RESULTS FROM THE NON-SCALING FFAG ACCELERATOR, EMMA
por: Smith, S L
Publicado: (2010) -
Diagnostic System Commissioning of the EMMA NS-FFAG Facility at Daresbury Laboratory
por: Kalinin, A, et al.
Publicado: (2010) -
TUNE MEASUREMENT IN NON SCALING FFAG EMMA WITH MODEL INDEPENDENT ANALYSIS
por: Giboudot, Y, et al.
Publicado: (2010) -
CHARACTERISATION OF THE ALICE ACCELERATOR AS AN INJECTOR FOR THE EMMA NS-FFAG
por: Garland, J M, et al.
Publicado: (2010)