Cargando…
Updated end-to-end simulations of Linac4
After a first definition stage, some changes were applied to Linac4 layout in order to refine some design choices and to improve the performances of the line. Therefore a new campaign of simulations was carried out, to detect mismatched points, and the obtained results are presented in this note.
Autores principales: | Garcia Tudela, M, Bellodi, G, Eshraqi, M, Hein, L M, Lallement, J B, Lombardi, A, Posocco, P A, Sargsyan, E |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1306774 |
Ejemplares similares
-
Alignment and Field Error Tolerance in Linac4
por: Bellodi, G, et al.
Publicado: (2011) -
End-to end simulations of LINAC4
por: Lanzone, S, et al.
Publicado: (2006) -
Beams dynamics optimisation of LINAC4 structures for increased operational flexibility
por: Bellodi, G, et al.
Publicado: (2010) -
End-to-End Beam Dynamics for CERN LINAC4
por: Lombardi, A, et al.
Publicado: (2006) -
Linac4 chopper line commissioning strategy
por: Bellodi, G, et al.
Publicado: (2010)