Cargando…
Operational Experience with LHC Collimation
A first sub-set of the collimation system has been installed for the 2008 first beam commissioning of the LHC. It included 88 collimators around the ring and the two injection lines. Each collimator has two jaws for which must be controlled and monitored with high precision. The LHC collimation syst...
Autor principal: | Assmann, R W |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1307561 |
Ejemplares similares
-
OPERATIONAL EXPERIENCE WITH A LHC COLLIMATOR PROTOTYPE IN THE CERN SPS
por: Redaelli, S, et al.
Publicado: (2009) -
BEAM COMMISSIONING PLAN FOR LHC COLLIMATION
por: Bracco, C, et al.
Publicado: (2009) -
CHROMATIC LHC OPTICS EFFECTS ON COLLIMATION PHASE SPACE CUTS
por: Bracco, C, et al.
Publicado: (2009) -
Comparison of carbon and HI-Z primary collimators for the LHC phase II collimation system
por: Keller, L, et al.
Publicado: (2010) -
FINAL IMPLEMENTATION AND PERFORMANCE OF THE LHC COLLIMATOR CONTROL SYSTEM
por: Redaelli, S, et al.
Publicado: (2009)