Cargando…
LHC CLEANING EFFICIENCYWITH IMPERFECTIONS
The performance reach of the LHC depends on the magnitude of beam losses and the achievable cleaning efficiency of its collimation system. The ideal performance reach for the nominal Phase 1 collimation system is reviewed. However, unavoidable imperfections affect any accelerator and can further det...
Autores principales: | Bracco, C, Assmann, R W, Redaelli, S, Weiler, T |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1307565 |
Ejemplares similares
-
STUDIES ON COMBINED MOMENTUM AND BETATRON CLEANING IN THE LHC
por: Assmann, R, et al.
Publicado: (2009) -
BEAM COMMISSIONING PLAN FOR LHC COLLIMATION
por: Bracco, C, et al.
Publicado: (2009) -
Collimators and Beam Cleaning: First Results and Future Plans
por: Bracco, C, et al.
Publicado: (2010) -
Energy Deposition Simulations and Measurements in an LHC Collimator and Beam Loss Monitors
por: Böhlen, Till, et al.
Publicado: (2009) -
First cleaning with LHC collimators
por: Wollmann, D, et al.
Publicado: (2010)