Cargando…

BEAM COMMISSIONING PLAN FOR LHC COLLIMATION

The Large Hadron Collider extends the present stateof- the-art in stored beam energy by 2-3 orders of magnitude. A sophisticated system of collimators is implemented along the 27 km ring and mainly in two dedicated cleaning insertions, to intercept and absorb unavoidable beam losses which could indu...

Descripción completa

Detalles Bibliográficos
Autores principales: Bracco, C, Assmann, R W, Redaelli, S, Weiler, T
Formato: info:eu-repo/semantics/article
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1307566
_version_ 1780921168668131328
author Bracco, C
Assmann, R W
Redaelli, S
Weiler, T
author_facet Bracco, C
Assmann, R W
Redaelli, S
Weiler, T
author_sort Bracco, C
collection CERN
description The Large Hadron Collider extends the present stateof- the-art in stored beam energy by 2-3 orders of magnitude. A sophisticated system of collimators is implemented along the 27 km ring and mainly in two dedicated cleaning insertions, to intercept and absorb unavoidable beam losses which could induce quenches in the superconducting (sc) magnets. 88 collimators for the two beams are initially installed for the so called Phase 1. An optimized strategy for the commissioning of this considerable number of collimators has been defined. This optimized strategy maximizes cleaning efficiency and tolerances available for operation, while minimizing the required beam time for collimator setup and ensuring at all times the required passive machine protection. It is shown that operational tolerances from collimation can initially be significantly relaxed.
format info:eu-repo/semantics/article
id cern-1307566
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-13075662019-09-30T06:29:59Z http://cds.cern.ch/record/1307566 eng Bracco, C Assmann, R W Redaelli, S Weiler, T BEAM COMMISSIONING PLAN FOR LHC COLLIMATION Accelerators and Storage Rings 8: Collimators & materials for higher beam power beam The Large Hadron Collider extends the present stateof- the-art in stored beam energy by 2-3 orders of magnitude. A sophisticated system of collimators is implemented along the 27 km ring and mainly in two dedicated cleaning insertions, to intercept and absorb unavoidable beam losses which could induce quenches in the superconducting (sc) magnets. 88 collimators for the two beams are initially installed for the so called Phase 1. An optimized strategy for the commissioning of this considerable number of collimators has been defined. This optimized strategy maximizes cleaning efficiency and tolerances available for operation, while minimizing the required beam time for collimator setup and ensuring at all times the required passive machine protection. It is shown that operational tolerances from collimation can initially be significantly relaxed. info:eu-repo/grantAgreement/EC/FP7/227579 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/1307566 2009
spellingShingle Accelerators and Storage Rings
8: Collimators & materials for higher beam power beam
Bracco, C
Assmann, R W
Redaelli, S
Weiler, T
BEAM COMMISSIONING PLAN FOR LHC COLLIMATION
title BEAM COMMISSIONING PLAN FOR LHC COLLIMATION
title_full BEAM COMMISSIONING PLAN FOR LHC COLLIMATION
title_fullStr BEAM COMMISSIONING PLAN FOR LHC COLLIMATION
title_full_unstemmed BEAM COMMISSIONING PLAN FOR LHC COLLIMATION
title_short BEAM COMMISSIONING PLAN FOR LHC COLLIMATION
title_sort beam commissioning plan for lhc collimation
topic Accelerators and Storage Rings
8: Collimators & materials for higher beam power beam
url http://cds.cern.ch/record/1307566
http://cds.cern.ch/record/1307566
work_keys_str_mv AT braccoc beamcommissioningplanforlhccollimation
AT assmannrw beamcommissioningplanforlhccollimation
AT redaellis beamcommissioningplanforlhccollimation
AT weilert beamcommissioningplanforlhccollimation