BEAM COMMISSIONING PLAN FOR LHC COLLIMATION
The Large Hadron Collider extends the present stateof- the-art in stored beam energy by 2-3 orders of magnitude. A sophisticated system of collimators is implemented along the 27 km ring and mainly in two dedicated cleaning insertions, to intercept and absorb unavoidable beam losses which could indu...
Autores principales: | , , , |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1307566 |
_version_ | 1780921168668131328 |
---|---|
author | Bracco, C Assmann, R W Redaelli, S Weiler, T |
author_facet | Bracco, C Assmann, R W Redaelli, S Weiler, T |
author_sort | Bracco, C |
collection | CERN |
description | The Large Hadron Collider extends the present stateof- the-art in stored beam energy by 2-3 orders of magnitude. A sophisticated system of collimators is implemented along the 27 km ring and mainly in two dedicated cleaning insertions, to intercept and absorb unavoidable beam losses which could induce quenches in the superconducting (sc) magnets. 88 collimators for the two beams are initially installed for the so called Phase 1. An optimized strategy for the commissioning of this considerable number of collimators has been defined. This optimized strategy maximizes cleaning efficiency and tolerances available for operation, while minimizing the required beam time for collimator setup and ensuring at all times the required passive machine protection. It is shown that operational tolerances from collimation can initially be significantly relaxed. |
format | info:eu-repo/semantics/article |
id | cern-1307566 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2009 |
record_format | invenio |
spelling | cern-13075662019-09-30T06:29:59Z http://cds.cern.ch/record/1307566 eng Bracco, C Assmann, R W Redaelli, S Weiler, T BEAM COMMISSIONING PLAN FOR LHC COLLIMATION Accelerators and Storage Rings 8: Collimators & materials for higher beam power beam The Large Hadron Collider extends the present stateof- the-art in stored beam energy by 2-3 orders of magnitude. A sophisticated system of collimators is implemented along the 27 km ring and mainly in two dedicated cleaning insertions, to intercept and absorb unavoidable beam losses which could induce quenches in the superconducting (sc) magnets. 88 collimators for the two beams are initially installed for the so called Phase 1. An optimized strategy for the commissioning of this considerable number of collimators has been defined. This optimized strategy maximizes cleaning efficiency and tolerances available for operation, while minimizing the required beam time for collimator setup and ensuring at all times the required passive machine protection. It is shown that operational tolerances from collimation can initially be significantly relaxed. info:eu-repo/grantAgreement/EC/FP7/227579 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/1307566 2009 |
spellingShingle | Accelerators and Storage Rings 8: Collimators & materials for higher beam power beam Bracco, C Assmann, R W Redaelli, S Weiler, T BEAM COMMISSIONING PLAN FOR LHC COLLIMATION |
title | BEAM COMMISSIONING PLAN FOR LHC COLLIMATION |
title_full | BEAM COMMISSIONING PLAN FOR LHC COLLIMATION |
title_fullStr | BEAM COMMISSIONING PLAN FOR LHC COLLIMATION |
title_full_unstemmed | BEAM COMMISSIONING PLAN FOR LHC COLLIMATION |
title_short | BEAM COMMISSIONING PLAN FOR LHC COLLIMATION |
title_sort | beam commissioning plan for lhc collimation |
topic | Accelerators and Storage Rings 8: Collimators & materials for higher beam power beam |
url | http://cds.cern.ch/record/1307566 http://cds.cern.ch/record/1307566 |
work_keys_str_mv | AT braccoc beamcommissioningplanforlhccollimation AT assmannrw beamcommissioningplanforlhccollimation AT redaellis beamcommissioningplanforlhccollimation AT weilert beamcommissioningplanforlhccollimation |