Cargando…
BEAM COMMISSIONING PLAN FOR LHC COLLIMATION
The Large Hadron Collider extends the present stateof- the-art in stored beam energy by 2-3 orders of magnitude. A sophisticated system of collimators is implemented along the 27 km ring and mainly in two dedicated cleaning insertions, to intercept and absorb unavoidable beam losses which could indu...
Autores principales: | Bracco, C, Assmann, R W, Redaelli, S, Weiler, T |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1307566 |
Ejemplares similares
-
Energy Deposition Simulations and Measurements in an LHC Collimator and Beam Loss Monitors
por: Böhlen, Till, et al.
Publicado: (2009) -
Collimators and Beam Cleaning: First Results and Future Plans
por: Bracco, C, et al.
Publicado: (2010) -
Comparison of carbon and HI-Z primary collimators for the LHC phase II collimation system
por: Keller, L, et al.
Publicado: (2010) -
OPERATIONAL EXPERIENCE WITH A LHC COLLIMATOR PROTOTYPE IN THE CERN SPS
por: Redaelli, S, et al.
Publicado: (2009) -
CHROMATIC LHC OPTICS EFFECTS ON COLLIMATION PHASE SPACE CUTS
por: Bracco, C, et al.
Publicado: (2009)