Summary of the Collimation Upgrade Plans

The LHC collimation system is being implemented in a two-phase approach that was defined in 2004. The phase I has been fully installed in the machine and is presently being commissioned with beam. The system will be completed with the installation of phase II and performance will be upgraded. The co...

Descripción completa

Detalles Bibliográficos
Autor principal: Assmann, R W
Formato: info:eu-repo/semantics/article
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1307576
Descripción
Sumario:The LHC collimation system is being implemented in a two-phase approach that was defined in 2004. The phase I has been fully installed in the machine and is presently being commissioned with beam. The system will be completed with the installation of phase II and performance will be upgraded. The completion and upgrade plans are summarized.