Cargando…
Summary of the Collimation Upgrade Plans
The LHC collimation system is being implemented in a two-phase approach that was defined in 2004. The phase I has been fully installed in the machine and is presently being commissioned with beam. The system will be completed with the installation of phase II and performance will be upgraded. The co...
Autor principal: | |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1307576 |
Sumario: | The LHC collimation system is being implemented in a two-phase approach that was defined in 2004. The phase I has been fully installed in the machine and is presently being commissioned with beam. The system will be completed with the installation of phase II and performance will be upgraded. The completion and upgrade plans are summarized. |
---|