Commissioning of the LHC Magnet Powering System in 2009
On 19th September 2008 the Large Hadron Collider (LHC) experienced a serious incident, caused by a defective electrical joint, which stopped beam operation just a few days after its beginning. During the following 14 months the damage was repaired, additional protection systems were installed and th...
Autores principales: | Solfaroli Camillocci, Matteo, Arduini, Gianluigi, Bellesia, Boris, Coupard, Julie, Dahlerup-Petersen, Knud, Koratzinos, Michael, Pojer, Mirko, Schmidt, Ruediger, Siemko, Andrzej, Thiesen, Hugues, Vergara-Fernandez, Antonio, Zanetti, Marco, Zerlauth, Markus |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1307870 |
Ejemplares similares
-
Information Management within the LHC Hardware Commissioning Project
por: Bellesia, B, et al.
Publicado: (2009) -
Coordination of the commissioning of the LHC technical systems
por: Saban, R, et al.
Publicado: (2008) -
Re-commissioning of the Superconducting Circuits
por: Solfaroli Camillocci, M, et al.
Publicado: (2015) -
Automated Execution and Tracking of the LHC Commissioning Tests
por: Fuchsberger, K, et al.
Publicado: (2012) -
The Commissioning of the LHC Technical Systems
por: Saban, R, et al.
Publicado: (2007)