For nominal beam parameters at 7 TeV/c each proton beam with a stored energy of 362 MJ threatens to damage accelerator equipment in case of uncontrolled beam loss. These parameters will only be reached after some years of operation, however, a small fraction of this energy is already sufficient to d...

Descripción completa

Detalles Bibliográficos
Autores principales: Schmidt, Ruediger, Assmann, Ralph, Dehning, Bernd, Ferro-Luzzi, Massimiliano, Goddard, Brennan, Lamont, Mike, Siemko, Andrzej, Uythoven, Jan, Wenninger, Jorg, Zerlauth, Markus
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1307884
Descripción
Sumario:For nominal beam parameters at 7 TeV/c each proton beam with a stored energy of 362 MJ threatens to damage accelerator equipment in case of uncontrolled beam loss. These parameters will only be reached after some years of operation, however, a small fraction of this energy is already sufficient to damage accelerator equipment or experiments. The correct functioning of the machine protection systems is vital during the different operational phases already for initial operation. When operating the complex magnet system, with and without beam, safe operation relies on the protection and interlock systems for the superconducting circuits. For safe injection and transfer of the beams from SPS to LHC, transfer line parameters are monitored, beam absorbers must be in the correct position and the LHC must be ready to accept beam. At the end of a fill and in case of failures beams must be properly extracted onto the dump blocks, for some types of failure within less than few hundred microseconds. Safe operation requires many systems: beam dumping system, beam interlocks, beam instrumentation, equipment monitoring, collimators and absorbers, etc. We describe the commissioning of the LHC machine protection system and the experience during initial operation