Cargando…
Maximizing the Efficiency of LHC Maintenance during Operation Times using a Mobile Tool
The operation of the Large Hadron Collider (LHC) imposes minimum maintenance time, when needed corrections to all systems are to be carried out. Today's maintenance management tools at CERN are seen as too slow and cumbersome for such a challenge. The short duration of the technical stops (72 h...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1310794 |
_version_ | 1780921238867148800 |
---|---|
author | Martel, Pedro Delamare, Christophe Mallon Amerigo, Sonia Pater, Lukasz Petit, Stephan Widegren, David |
author_facet | Martel, Pedro Delamare, Christophe Mallon Amerigo, Sonia Pater, Lukasz Petit, Stephan Widegren, David |
author_sort | Martel, Pedro |
collection | CERN |
description | The operation of the Large Hadron Collider (LHC) imposes minimum maintenance time, when needed corrections to all systems are to be carried out. Today's maintenance management tools at CERN are seen as too slow and cumbersome for such a challenge. The short duration of the technical stops (72 h/month) requires preparation of jobs in advance, and coordination of all involved teams; at the same time, the radio-protection of personnel in the LHC underground areas imposes a strict "As Low As Reasonably Achievable"(ALARA) policy for the works' duration. In order to perform a maximum of tasks in a short time, a mobile tool for the manipulation of job and equipment data has been created. The ability to signal a new job to a team in the field will avoid unnecessary trips to the tunnel; the signalling of a job's completion (and its details) will allow subsequent jobs to start promptly and with more information; finally, the possibility to consult equipment's full manufacturing and installation data "in situ" will help with the investigation of unforeseen situations. In a 27 km environment with scarce Wi-Fi connectivity, an online light tool is now available, covering the essentials of asset maintenance tasks |
id | cern-1310794 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2010 |
record_format | invenio |
spelling | cern-13107942022-08-17T13:24:25Zhttp://cds.cern.ch/record/1310794engMartel, PedroDelamare, ChristopheMallon Amerigo, SoniaPater, LukaszPetit, StephanWidegren, DavidMaximizing the Efficiency of LHC Maintenance during Operation Times using a Mobile ToolAccelerators and Storage RingsThe operation of the Large Hadron Collider (LHC) imposes minimum maintenance time, when needed corrections to all systems are to be carried out. Today's maintenance management tools at CERN are seen as too slow and cumbersome for such a challenge. The short duration of the technical stops (72 h/month) requires preparation of jobs in advance, and coordination of all involved teams; at the same time, the radio-protection of personnel in the LHC underground areas imposes a strict "As Low As Reasonably Achievable"(ALARA) policy for the works' duration. In order to perform a maximum of tasks in a short time, a mobile tool for the manipulation of job and equipment data has been created. The ability to signal a new job to a team in the field will avoid unnecessary trips to the tunnel; the signalling of a job's completion (and its details) will allow subsequent jobs to start promptly and with more information; finally, the possibility to consult equipment's full manufacturing and installation data "in situ" will help with the investigation of unforeseen situations. In a 27 km environment with scarce Wi-Fi connectivity, an online light tool is now available, covering the essentials of asset maintenance tasksoai:cds.cern.ch:13107942010 |
spellingShingle | Accelerators and Storage Rings Martel, Pedro Delamare, Christophe Mallon Amerigo, Sonia Pater, Lukasz Petit, Stephan Widegren, David Maximizing the Efficiency of LHC Maintenance during Operation Times using a Mobile Tool |
title | Maximizing the Efficiency of LHC Maintenance during Operation Times using a Mobile Tool |
title_full | Maximizing the Efficiency of LHC Maintenance during Operation Times using a Mobile Tool |
title_fullStr | Maximizing the Efficiency of LHC Maintenance during Operation Times using a Mobile Tool |
title_full_unstemmed | Maximizing the Efficiency of LHC Maintenance during Operation Times using a Mobile Tool |
title_short | Maximizing the Efficiency of LHC Maintenance during Operation Times using a Mobile Tool |
title_sort | maximizing the efficiency of lhc maintenance during operation times using a mobile tool |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1310794 |
work_keys_str_mv | AT martelpedro maximizingtheefficiencyoflhcmaintenanceduringoperationtimesusingamobiletool AT delamarechristophe maximizingtheefficiencyoflhcmaintenanceduringoperationtimesusingamobiletool AT mallonamerigosonia maximizingtheefficiencyoflhcmaintenanceduringoperationtimesusingamobiletool AT paterlukasz maximizingtheefficiencyoflhcmaintenanceduringoperationtimesusingamobiletool AT petitstephan maximizingtheefficiencyoflhcmaintenanceduringoperationtimesusingamobiletool AT widegrendavid maximizingtheefficiencyoflhcmaintenanceduringoperationtimesusingamobiletool |