Cargando…

New protection scheme and pressure relief-valve staging of the LHC insulation vacuum enclosure following the 19th September 2008 incident

This note defines the new protection scheme and the pressure relief valve staging of the LHC insulation vacuum enclosure which has to be implemented following the 19th September 2008 incident in the Sector 3-4. This note covers all the equipment located in the arcs, dispersion suppressors, matching...

Descripción completa

Detalles Bibliográficos
Autores principales: Cruikshank, P, Parma, V, Perin, A, Tavian, L
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1316475
_version_ 1780921396101120000
author Cruikshank, P
Parma, V
Perin, A
Tavian, L
author_facet Cruikshank, P
Parma, V
Perin, A
Tavian, L
author_sort Cruikshank, P
collection CERN
description This note defines the new protection scheme and the pressure relief valve staging of the LHC insulation vacuum enclosure which has to be implemented following the 19th September 2008 incident in the Sector 3-4. This note covers all the equipment located in the arcs, dispersion suppressors, matching sections and inner-triplets, including the QRL cryogenic line. As part of the machine will not be consolidated until the long shutdown scheduled after the first LHC operation years, a temporary protection scheme is also defined allowing a safe LHC operation at reduced beam energy.
id cern-1316475
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2010
record_format invenio
spelling cern-13164752019-09-30T06:29:59Zhttp://cds.cern.ch/record/1316475engCruikshank, PParma, VPerin, ATavian, LNew protection scheme and pressure relief-valve staging of the LHC insulation vacuum enclosure following the 19th September 2008 incidentAccelerators and Storage RingsThis note defines the new protection scheme and the pressure relief valve staging of the LHC insulation vacuum enclosure which has to be implemented following the 19th September 2008 incident in the Sector 3-4. This note covers all the equipment located in the arcs, dispersion suppressors, matching sections and inner-triplets, including the QRL cryogenic line. As part of the machine will not be consolidated until the long shutdown scheduled after the first LHC operation years, a temporary protection scheme is also defined allowing a safe LHC operation at reduced beam energy.CERN-ATS-Note-2010-057 TECHoai:cds.cern.ch:13164752010-12-01
spellingShingle Accelerators and Storage Rings
Cruikshank, P
Parma, V
Perin, A
Tavian, L
New protection scheme and pressure relief-valve staging of the LHC insulation vacuum enclosure following the 19th September 2008 incident
title New protection scheme and pressure relief-valve staging of the LHC insulation vacuum enclosure following the 19th September 2008 incident
title_full New protection scheme and pressure relief-valve staging of the LHC insulation vacuum enclosure following the 19th September 2008 incident
title_fullStr New protection scheme and pressure relief-valve staging of the LHC insulation vacuum enclosure following the 19th September 2008 incident
title_full_unstemmed New protection scheme and pressure relief-valve staging of the LHC insulation vacuum enclosure following the 19th September 2008 incident
title_short New protection scheme and pressure relief-valve staging of the LHC insulation vacuum enclosure following the 19th September 2008 incident
title_sort new protection scheme and pressure relief-valve staging of the lhc insulation vacuum enclosure following the 19th september 2008 incident
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1316475
work_keys_str_mv AT cruikshankp newprotectionschemeandpressurereliefvalvestagingofthelhcinsulationvacuumenclosurefollowingthe19thseptember2008incident
AT parmav newprotectionschemeandpressurereliefvalvestagingofthelhcinsulationvacuumenclosurefollowingthe19thseptember2008incident
AT perina newprotectionschemeandpressurereliefvalvestagingofthelhcinsulationvacuumenclosurefollowingthe19thseptember2008incident
AT tavianl newprotectionschemeandpressurereliefvalvestagingofthelhcinsulationvacuumenclosurefollowingthe19thseptember2008incident