Cargando…
New protection scheme and pressure relief-valve staging of the LHC insulation vacuum enclosure following the 19th September 2008 incident
This note defines the new protection scheme and the pressure relief valve staging of the LHC insulation vacuum enclosure which has to be implemented following the 19th September 2008 incident in the Sector 3-4. This note covers all the equipment located in the arcs, dispersion suppressors, matching...
Autores principales: | Cruikshank, P, Parma, V, Perin, A, Tavian, L |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1316475 |
Ejemplares similares
-
Report of the Task Force on the Incident of 19th September 2008 at the LHC
por: Bajko, M, et al.
Publicado: (2009) -
Insulation vacuum system of the LHC
por: Cruikshank, P, et al.
Publicado: (1997) -
Risk analysis update of the LHC cryogenic system following the 19th September 2008 incident
por: Chorowski, M, et al.
Publicado: (2011) -
Insulation vacuum and beam vacuum overpressure release
por: Parma, V
Publicado: (2009) -
Investigation of Thermal and Vacuum Transients on the LHC Prototype Magnet String
por: Cruikshank, P, et al.
Publicado: (1996)