Cargando…
Closing LHCb's calorimeter around the beam-pipe
Photos 1 and 2 show the pre-shower, lead absorber and the scintillating pad detector layers moving in towards the beam-pipe. Photos 3,4 and 5 show the hadron calorimeter with both halves closed around the beam-pipe, to the left of the picture and, in the centre, half of the electromagnetic calorimet...
Autor principal: | Kristic, R |
---|---|
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1330680 |
Ejemplares similares
-
View of LHCb's electromagnetic calorimeter closed around the beam-pipe
por: Kristic, R
Publicado: (2008) -
Distribution pipes for LHCb's cooling system
por: Kristic, R
Publicado: (2007) -
Closing the LHCb Tracker system with the beam pipe in place
por: Lindner, R
Publicado: (2008) -
Installation of the cabling for LHCb's pre-shower detector (part of LHCb's calorimeter)
por: Kristic, R
Publicado: (2007) -
Installation of the cabling for LHCb's pre-shower detector (part of LHCb's calorimeter)
por: Kristic, R
Publicado: (2007)