Cargando…
Installation of the LHCb Inner Tracker support frames into their final position
Autor principal: | Lindner, R |
---|---|
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1330688 |
Ejemplares similares
-
Moving one LHCb Outer Tracker frame from the assembly position into its final position
por: Lindner, R
Publicado: (2006) -
Inspection of the LHCb Upstream Tracker (UT) in clean room before installation
por: Brice, Maximilien
Publicado: (2022) -
Closing the LHCb Tracker system with the beam pipe in place
por: Lindner, R
Publicado: (2008) -
The new LHCb data centre being installed in 2019
por: Lindner, Rolf
Publicado: (2019) -
Installation of the mobile support structure for one of LHCb's calorimeter
por: Kristic, R
Publicado: (2004)