Which systems (except main circuits) should be commissioned/tested for 7 TeV operation before the long shutdown?
The key driver of the long 2012/13 shutdown is the consolidation of the 13 kA splices. Once the machine will be back to operation, the increase of energy to 7 TeV should be possible. Are all circuits and systems ready for 7 TeV operation? This paper focuses on what else could limit LHC high energy o...