Which systems (except main circuits) should be commissioned/tested for 7 TeV operation before the long shutdown?
The key driver of the long 2012/13 shutdown is the consolidation of the 13 kA splices. Once the machine will be back to operation, the increase of energy to 7 TeV should be possible. Are all circuits and systems ready for 7 TeV operation? This paper focuses on what else could limit LHC high energy o...
Autor principal: | Pojer, M |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-005.81 http://cds.cern.ch/record/1353831 |
Ejemplares similares
-
Re-commissioning of the Superconducting Circuits
por: Solfaroli Camillocci, M, et al.
Publicado: (2015) -
Performance of the Main Dipole Magnet Circuits of the LHC during Commissioning
por: Verweij, A, et al.
Publicado: (2008) -
Chapter 16: Commissioning and Operation
por: Lamont, M., et al.
Publicado: (2015) -
Summary of the Post-Long Shutdown 2 LHC Hardware Commissioning Campaign
por: Apollonio, Andrea, et al.
Publicado: (2022) -
Summary of Session 7 "After Long Shutdown 1"
por: Pojer, M, et al.
Publicado: (2012)