Work organization for splice consolidation
The Splices Task Force has worked in 2010 to prepare the necessary interventions for 7 TeV operation. The design solution for consolidating the main interconnection splices is well advanced. The required activities to implement it are described, highlighting working assumptions, missing resources an...
Autor principal: | Bertinelli, F |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-005.90 http://cds.cern.ch/record/1353834 |
Ejemplares similares
-
Towards a Consolidation of LHC Superconducting Splices for 7 TeV Operation
por: Bertinelli, F, et al.
Publicado: (2010) -
Consolidation of the 13 kA Splices in the Electrical Feedboxes of the LHC
por: Perin, A, et al.
Publicado: (2012) -
Splice Consolidation: What will we do: Status of the main Technical Solutions
por: Fessia, P
Publicado: (2011) -
Electrical Resistance of the Solder Connections for the Consolidation of the LHC Main Interconnection Splices
por: Lutum, R, et al.
Publicado: (2013) -
ELECTRO-THERMAL AND MECHANICAL VALIDATION EXPERIMENT ON THE LHC MAIN BUSBAR SPLICE CONSOLIDATION
por: Willering, GP, et al.
Publicado: (2012)