Cargando…

Installing collimators in the next long shut-down: plans, status and challenges

The first part of the collimation upgrade plan features the installation of 4 collimators in the 2 DS of point 3, in addition to the upgrade of the existing collimation system. What makes this upgrade so special is that for the first time collimators will be placed within the continuous cryostat of...

Descripción completa

Detalles Bibliográficos
Autor principal: Parma, V
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2011-005.99
http://cds.cern.ch/record/1353836

Ejemplares similares