Cargando…
QPS/LHC Activities requiring important Tunnel Work During a future long Shutdown
The MPE/circuit protection section is presently establishing a road map for its future LHC activities. The tasks comprise essential consolidation work, compulsory upgrades and extensions of existing machine facilities. The results of a first round of engineering exertion were presented and evaluated...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-005.114 http://cds.cern.ch/record/1353839 |
_version_ | 1780922360071716864 |
---|---|
author | Dahlerup-Petersen, K |
author_facet | Dahlerup-Petersen, K |
author_sort | Dahlerup-Petersen, K |
collection | CERN |
description | The MPE/circuit protection section is presently establishing a road map for its future LHC activities. The tasks comprise essential consolidation work, compulsory upgrades and extensions of existing machine facilities. The results of a first round of engineering exertion were presented and evaluated at a MPE activity review in December 2010. The technical and financial aspects of this program will be detailed in the ‘QPS Medium and Long-Term Improvement Plan’, to be published shortly. The QPS activities in the LHC tunnel during a future, long shutdown are closely related to this improvement chart. A project-package based program for the interventions has been established and will be presented in this report, together with estimates for the associated human and financial resources necessary for its implementation. |
id | cern-1353839 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-13538392022-08-10T20:25:22Zdoi:10.5170/CERN-2011-005.114http://cds.cern.ch/record/1353839engDahlerup-Petersen, KQPS/LHC Activities requiring important Tunnel Work During a future long ShutdownAccelerators and Storage RingsThe MPE/circuit protection section is presently establishing a road map for its future LHC activities. The tasks comprise essential consolidation work, compulsory upgrades and extensions of existing machine facilities. The results of a first round of engineering exertion were presented and evaluated at a MPE activity review in December 2010. The technical and financial aspects of this program will be detailed in the ‘QPS Medium and Long-Term Improvement Plan’, to be published shortly. The QPS activities in the LHC tunnel during a future, long shutdown are closely related to this improvement chart. A project-package based program for the interventions has been established and will be presented in this report, together with estimates for the associated human and financial resources necessary for its implementation.oai:cds.cern.ch:13538392011 |
spellingShingle | Accelerators and Storage Rings Dahlerup-Petersen, K QPS/LHC Activities requiring important Tunnel Work During a future long Shutdown |
title | QPS/LHC Activities requiring important Tunnel Work During a future long Shutdown |
title_full | QPS/LHC Activities requiring important Tunnel Work During a future long Shutdown |
title_fullStr | QPS/LHC Activities requiring important Tunnel Work During a future long Shutdown |
title_full_unstemmed | QPS/LHC Activities requiring important Tunnel Work During a future long Shutdown |
title_short | QPS/LHC Activities requiring important Tunnel Work During a future long Shutdown |
title_sort | qps/lhc activities requiring important tunnel work during a future long shutdown |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.5170/CERN-2011-005.114 http://cds.cern.ch/record/1353839 |
work_keys_str_mv | AT dahleruppetersenk qpslhcactivitiesrequiringimportanttunnelworkduringafuturelongshutdown |