QPS/LHC Activities requiring important Tunnel Work During a future long Shutdown
The MPE/circuit protection section is presently establishing a road map for its future LHC activities. The tasks comprise essential consolidation work, compulsory upgrades and extensions of existing machine facilities. The results of a first round of engineering exertion were presented and evaluated...
Autor principal: | Dahlerup-Petersen, K |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-005.114 http://cds.cern.ch/record/1353839 |
Ejemplares similares
-
QPS performance during the 2016 LHC run
por: Steckert, J, et al.
Publicado: (2017) -
Long Shutdown 2 @ LHC
por: Bernardini, M, et al.
Publicado: (2015) -
QPS - operational aspects
por: Pojer, M
Publicado: (2016) -
QPS Upgrade and Re-commissioning
por: Denz, R
Publicado: (2009) -
CV activities on the LHC complex during the long shutdown
por: Deleval, S, et al.
Publicado: (2011)