Kickers and dumps
Envisaged major interventions on the systems under the responsibility of TE-ABT include the completion of the staged dilution kicker system in LSS6, upgrade of the extraction protection elements TCDQ and possibly the replacement of a number of injection kickers. The reliability overhaul of the extra...
Autor principal: | Mertens, V |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-005.118 http://cds.cern.ch/record/1353840 |
Ejemplares similares
-
Impedance Measurements on the LHC Dump Kicker Prototype
por: González, C, et al.
Publicado: (1998) -
DESY III: dump system with one fast kicker
por: Rümmler, J
Publicado: (1996) -
Faults Detection on the LHC Beam Dump Kicker System
por: Dissing, T
Publicado: (1999) -
Commissioning of the Control System for the LHC Beam Dump Kicker System
por: Carlier, E, et al.
Publicado: (2010) -
Reliability analysis of the vertical kicker of the SPS Beam Dumping System
por: Blumenschein, Miriam Ruth
Publicado: (2019)