Cargando…
The LHC RF System: plans for the next long shutdown
The potential limitations for future running of the LHC RF systems are presented. In particular the problems of trips, hardware failures and limitations encountered during 2010 operation period are discussed, with emphasize on the possible hardware modifications and upgrades during the next long shu...
Autor principal: | Brunner, O |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-005.122 http://cds.cern.ch/record/1353841 |
Ejemplares similares
-
Long Shutdown 2 @ LHC
por: Bernardini, M, et al.
Publicado: (2015) -
LHC RF system reliability
por: Brunner, O
Publicado: (2016) -
Status and commissioning plans for LHC Run 2. The RF system.
por: Baudrenghien, P, et al.
Publicado: (2014) -
EN/EL Activities during the next long Shutdown
por: Duval, F
Publicado: (2011) -
The First Long Shutdown (LS1) for the LHC
por: Bordry, F, et al.
Publicado: (2013)