Cargando…

R2E relocation and shielding activities

In the framework of the R2E (Radiation to Electronics) mitigation project, relocation and shielding campaigns will be performed during the next long shutdown in parallel in Points 1, 5, 7 and 8. About 15 groups will be involved in these R2E activities with work periods from few days to several month...

Descripción completa

Detalles Bibliográficos
Autor principal: Perrot, A
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2011-005.125
http://cds.cern.ch/record/1353842
Descripción
Sumario:In the framework of the R2E (Radiation to Electronics) mitigation project, relocation and shielding campaigns will be performed during the next long shutdown in parallel in Points 1, 5, 7 and 8. About 15 groups will be involved in these R2E activities with work periods from few days to several months. The baseline for these relocations and shielding installations is today defined. The status of the integration studies and their constraints will be discussed aiming for the different teams to be ready for the 2012 shutdown. The impact on the work achievement of a possible delay of the R2E activities by one year will be presented.