R2E relocation and shielding activities
In the framework of the R2E (Radiation to Electronics) mitigation project, relocation and shielding campaigns will be performed during the next long shutdown in parallel in Points 1, 5, 7 and 8. About 15 groups will be involved in these R2E activities with work periods from few days to several month...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-005.125 http://cds.cern.ch/record/1353842 |
_version_ | 1780922360710299648 |
---|---|
author | Perrot, A |
author_facet | Perrot, A |
author_sort | Perrot, A |
collection | CERN |
description | In the framework of the R2E (Radiation to Electronics) mitigation project, relocation and shielding campaigns will be performed during the next long shutdown in parallel in Points 1, 5, 7 and 8. About 15 groups will be involved in these R2E activities with work periods from few days to several months. The baseline for these relocations and shielding installations is today defined. The status of the integration studies and their constraints will be discussed aiming for the different teams to be ready for the 2012 shutdown. The impact on the work achievement of a possible delay of the R2E activities by one year will be presented. |
id | cern-1353842 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-13538422022-08-10T21:04:17Zdoi:10.5170/CERN-2011-005.125http://cds.cern.ch/record/1353842engPerrot, AR2E relocation and shielding activitiesAccelerators and Storage RingsIn the framework of the R2E (Radiation to Electronics) mitigation project, relocation and shielding campaigns will be performed during the next long shutdown in parallel in Points 1, 5, 7 and 8. About 15 groups will be involved in these R2E activities with work periods from few days to several months. The baseline for these relocations and shielding installations is today defined. The status of the integration studies and their constraints will be discussed aiming for the different teams to be ready for the 2012 shutdown. The impact on the work achievement of a possible delay of the R2E activities by one year will be presented.oai:cds.cern.ch:13538422011 |
spellingShingle | Accelerators and Storage Rings Perrot, A R2E relocation and shielding activities |
title | R2E relocation and shielding activities |
title_full | R2E relocation and shielding activities |
title_fullStr | R2E relocation and shielding activities |
title_full_unstemmed | R2E relocation and shielding activities |
title_short | R2E relocation and shielding activities |
title_sort | r2e relocation and shielding activities |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.5170/CERN-2011-005.125 http://cds.cern.ch/record/1353842 |
work_keys_str_mv | AT perrota r2erelocationandshieldingactivities |