Cargando…

R2E relocation and shielding activities

In the framework of the R2E (Radiation to Electronics) mitigation project, relocation and shielding campaigns will be performed during the next long shutdown in parallel in Points 1, 5, 7 and 8. About 15 groups will be involved in these R2E activities with work periods from few days to several month...

Descripción completa

Detalles Bibliográficos
Autor principal: Perrot, A
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2011-005.125
http://cds.cern.ch/record/1353842
_version_ 1780922360710299648
author Perrot, A
author_facet Perrot, A
author_sort Perrot, A
collection CERN
description In the framework of the R2E (Radiation to Electronics) mitigation project, relocation and shielding campaigns will be performed during the next long shutdown in parallel in Points 1, 5, 7 and 8. About 15 groups will be involved in these R2E activities with work periods from few days to several months. The baseline for these relocations and shielding installations is today defined. The status of the integration studies and their constraints will be discussed aiming for the different teams to be ready for the 2012 shutdown. The impact on the work achievement of a possible delay of the R2E activities by one year will be presented.
id cern-1353842
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2011
record_format invenio
spelling cern-13538422022-08-10T21:04:17Zdoi:10.5170/CERN-2011-005.125http://cds.cern.ch/record/1353842engPerrot, AR2E relocation and shielding activitiesAccelerators and Storage RingsIn the framework of the R2E (Radiation to Electronics) mitigation project, relocation and shielding campaigns will be performed during the next long shutdown in parallel in Points 1, 5, 7 and 8. About 15 groups will be involved in these R2E activities with work periods from few days to several months. The baseline for these relocations and shielding installations is today defined. The status of the integration studies and their constraints will be discussed aiming for the different teams to be ready for the 2012 shutdown. The impact on the work achievement of a possible delay of the R2E activities by one year will be presented.oai:cds.cern.ch:13538422011
spellingShingle Accelerators and Storage Rings
Perrot, A
R2E relocation and shielding activities
title R2E relocation and shielding activities
title_full R2E relocation and shielding activities
title_fullStr R2E relocation and shielding activities
title_full_unstemmed R2E relocation and shielding activities
title_short R2E relocation and shielding activities
title_sort r2e relocation and shielding activities
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-2011-005.125
http://cds.cern.ch/record/1353842
work_keys_str_mv AT perrota r2erelocationandshieldingactivities