Cargando…
R2E relocation and shielding activities
In the framework of the R2E (Radiation to Electronics) mitigation project, relocation and shielding campaigns will be performed during the next long shutdown in parallel in Points 1, 5, 7 and 8. About 15 groups will be involved in these R2E activities with work periods from few days to several month...
Autor principal: | Perrot, A |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-005.125 http://cds.cern.ch/record/1353842 |
Ejemplares similares
-
Optimisation and Implementation of the R2E Shielding and Relocation Mitigation Measures at the LHC during the LS1
por: Perrot, A L, et al.
Publicado: (2014) -
R2E strategy and activities during LS1
por: Perrot, A
Publicado: (2012) -
Length saving in TESLA structure by relocation of tuner
por: Kaiser, H
Publicado: (1999) -
The dynamic aperture of LHC version 2 with relocated and missing chromaticity sextupoles
por: Miles, J F
Publicado: (1995) -
Shielding for ACOL
por: Sullivan, A H
Publicado: (1984)