Cargando…

EN/EL Activities during the next long Shutdown

The EL group will participate in many activities during the next long shutdown. They are divided in four categories: • Projects which require an extension or modification of the distribution network. • Consolidation work of the electrical distribution infrastructure led by EN/EL. • Scheduled mainten...

Descripción completa

Detalles Bibliográficos
Autor principal: Duval, F
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2011-005.134
http://cds.cern.ch/record/1353844
_version_ 1780922361134972928
author Duval, F
author_facet Duval, F
author_sort Duval, F
collection CERN
description The EL group will participate in many activities during the next long shutdown. They are divided in four categories: • Projects which require an extension or modification of the distribution network. • Consolidation work of the electrical distribution infrastructure led by EN/EL. • Scheduled maintenance activities and, in addition, the maintenance activities postponed since the start of the LHC. • Many upgrades of EN/EL infrastructure following an evolution of the power request (from EN/EL or other groups). It should be noticed that so far, we know only a small part of the work for which we will be involved. Indeed, projects must be sufficiently defined by our colleagues before submitting us their request. Furthermore, it should be noted that the decision to delay from 2012 to 2013 the long shutdown will lead to a schedule change of some projects and will increase the risk of failure of EN/EL equipment due to a lack of maintenance. This postponement of the long shutdown will be preceded by an additional Christmas break; we hope it will be longer than the past two. The work program is too tight and leaves us no time to repair any defects found during the various tests and increases our rate of human mistakes.
id cern-1353844
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2011
record_format invenio
spelling cern-13538442022-08-10T20:25:23Zdoi:10.5170/CERN-2011-005.134http://cds.cern.ch/record/1353844engDuval, FEN/EL Activities during the next long ShutdownAccelerators and Storage RingsThe EL group will participate in many activities during the next long shutdown. They are divided in four categories: • Projects which require an extension or modification of the distribution network. • Consolidation work of the electrical distribution infrastructure led by EN/EL. • Scheduled maintenance activities and, in addition, the maintenance activities postponed since the start of the LHC. • Many upgrades of EN/EL infrastructure following an evolution of the power request (from EN/EL or other groups). It should be noticed that so far, we know only a small part of the work for which we will be involved. Indeed, projects must be sufficiently defined by our colleagues before submitting us their request. Furthermore, it should be noted that the decision to delay from 2012 to 2013 the long shutdown will lead to a schedule change of some projects and will increase the risk of failure of EN/EL equipment due to a lack of maintenance. This postponement of the long shutdown will be preceded by an additional Christmas break; we hope it will be longer than the past two. The work program is too tight and leaves us no time to repair any defects found during the various tests and increases our rate of human mistakes.oai:cds.cern.ch:13538442011
spellingShingle Accelerators and Storage Rings
Duval, F
EN/EL Activities during the next long Shutdown
title EN/EL Activities during the next long Shutdown
title_full EN/EL Activities during the next long Shutdown
title_fullStr EN/EL Activities during the next long Shutdown
title_full_unstemmed EN/EL Activities during the next long Shutdown
title_short EN/EL Activities during the next long Shutdown
title_sort en/el activities during the next long shutdown
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-2011-005.134
http://cds.cern.ch/record/1353844
work_keys_str_mv AT duvalf enelactivitiesduringthenextlongshutdown