Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown
This paper presents the 2012/2013 long shutdown activities for the access, emergency evacuation, gas and fire detection systems. First, an overview of the required minimal annual maintenance and tests is presented; including the first feedback from the 9 weeks of the Technical Stop. Second, planned...
Autores principales: | , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-005.137 http://cds.cern.ch/record/1353845 |
_version_ | 1780922361352028160 |
---|---|
author | Grau, S Delamare, C Ladzinski, T Ninin, P Nunes, R |
author_facet | Grau, S Delamare, C Ladzinski, T Ninin, P Nunes, R |
author_sort | Grau, S |
collection | CERN |
description | This paper presents the 2012/2013 long shutdown activities for the access, emergency evacuation, gas and fire detection systems. First, an overview of the required minimal annual maintenance and tests is presented; including the first feedback from the 9 weeks of the Technical Stop. Second, planned upgrades, new installations and consolidation activities, such as the R2E relocations and systems improvements, are discussed. For all these activities, the required resources are estimated, the constraints on other groups are listed, the associated risks analyzed and time estimation provided. The evaluation of the required resources takes into consideration the activities in the injector chain during the long shutdown. |
id | cern-1353845 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-13538452022-08-10T20:25:23Zdoi:10.5170/CERN-2011-005.137http://cds.cern.ch/record/1353845engGrau, SDelamare, CLadzinski, TNinin, PNunes, RAccess and Alarm Safety Systems - Activities for the 2012/2013 Long ShutdownAccelerators and Storage RingsThis paper presents the 2012/2013 long shutdown activities for the access, emergency evacuation, gas and fire detection systems. First, an overview of the required minimal annual maintenance and tests is presented; including the first feedback from the 9 weeks of the Technical Stop. Second, planned upgrades, new installations and consolidation activities, such as the R2E relocations and systems improvements, are discussed. For all these activities, the required resources are estimated, the constraints on other groups are listed, the associated risks analyzed and time estimation provided. The evaluation of the required resources takes into consideration the activities in the injector chain during the long shutdown.oai:cds.cern.ch:13538452011 |
spellingShingle | Accelerators and Storage Rings Grau, S Delamare, C Ladzinski, T Ninin, P Nunes, R Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown |
title | Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown |
title_full | Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown |
title_fullStr | Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown |
title_full_unstemmed | Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown |
title_short | Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown |
title_sort | access and alarm safety systems - activities for the 2012/2013 long shutdown |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.5170/CERN-2011-005.137 http://cds.cern.ch/record/1353845 |
work_keys_str_mv | AT graus accessandalarmsafetysystemsactivitiesforthe20122013longshutdown AT delamarec accessandalarmsafetysystemsactivitiesforthe20122013longshutdown AT ladzinskit accessandalarmsafetysystemsactivitiesforthe20122013longshutdown AT nininp accessandalarmsafetysystemsactivitiesforthe20122013longshutdown AT nunesr accessandalarmsafetysystemsactivitiesforthe20122013longshutdown |