Cargando…
Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown
This paper presents the 2012/2013 long shutdown activities for the access, emergency evacuation, gas and fire detection systems. First, an overview of the required minimal annual maintenance and tests is presented; including the first feedback from the 9 weeks of the Technical Stop. Second, planned...
Autores principales: | Grau, S, Delamare, C, Ladzinski, T, Ninin, P, Nunes, R |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-005.137 http://cds.cern.ch/record/1353845 |
Ejemplares similares
-
Access Systems During the LHC Injection Test
por: Grau, S, et al.
Publicado: (2006) -
LHC Access System: from Design to Operation
por: Pettersson, Thomas Sven, et al.
Publicado: (2008) -
Safety testing for LHC access system
por: Valentini, F, et al.
Publicado: (2008) -
Access systems strategy in the accelerator complex and experimental areas
por: Nunes, R, et al.
Publicado: (2012) -
Experience Using the Functional Safety Principles to Design the CERN Safety Alarm Monitoring System
por: Scibile, L, et al.
Publicado: (2003)