Experience with MPS during the 2010 run

In 2010 the LHC stored beam energy was pushed to 25 MJ, ten times above TEVATRON, in little over 6 months. No machine protection issues were recorded, and the reliability of the machine protection system (MPS) did not impact beam operation in a significant way. After an initial phase of low intensit...