Preparing the Machine Protection System for the 2011 run
The expected performance of the Machine Protection System for 2011 is presented. An overview of the foreseen modifications to the machine protection system components during the Christmas stop and the required time for recommissioning is given. The possible impact of the MPS on the operational param...
Autor principal: | Uythoven, J |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-005.227 http://cds.cern.ch/record/1353862 |
Ejemplares similares
-
Machine Protection System response in 2011
por: Zerlauth, M, et al.
Publicado: (2012) -
Machine Protection Systems Performance And Issues 2012
por: Wollmann, D, et al.
Publicado: (2012) -
Discussion: The Minumum Workable LHC - Machine Protection and Collimation
por: Uythoven, J
Publicado: (2006) -
Commissioning and Ealy Operation: View from Machine Protection
por: Uythoven, J
Publicado: (2006) -
Summary: Machine Protection Issues Affecting Beam Commissioning
por: Schmidt, R, et al.
Publicado: (2006)