Cargando…

Is there a limitation to the stored beam energy for 2011 and beyond?

The machine protection systems have been designed to ultimately operate with beams of a stored energy of 360MJ. This presentation will address if there is an intermediate limit and what upgrades are required to permit operation with 360MJ. A failure in one of the protection systems (BLM, BIC, LBDS,...

Descripción completa

Detalles Bibliográficos
Autor principal: Schmidt, R
Lenguaje:eng
Publicado: CERN 2011
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2011-005.241
http://cds.cern.ch/record/1353865

Ejemplares similares