Cargando…
Heavy Ions in 2011 and beyond
The LHC's first heavy ion run set - and tested - the operational pattern for 2011 and later years: a rapid commissioning strategy intended to ensure delivery of integrated luminosity despite the risks associated with the short time-frame. It also gave us hard data to test our understanding of t...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-005.276 http://cds.cern.ch/record/1353871 |
_version_ | 1780922366476419072 |
---|---|
author | Jowett, J Baudrenghien, P Bruce, R Carli, C Manglunki, D Mertens, T Wollmann, D |
author_facet | Jowett, J Baudrenghien, P Bruce, R Carli, C Manglunki, D Mertens, T Wollmann, D |
author_sort | Jowett, J |
collection | CERN |
description | The LHC's first heavy ion run set - and tested - the operational pattern for 2011 and later years: a rapid commissioning strategy intended to ensure delivery of integrated luminosity despite the risks associated with the short time-frame. It also gave us hard data to test our understanding of the beam physics that will limit performance. The 2010 experience is fed into the commissioning plan, parameter choices and projected performance for 2011. The prospects for future stages of the LHC ion program, Pb-Pb collisions at higher energy and luminosity, hybrid collisions and other species, depend critically on the scheduling of certain hardware upgrades. |
id | cern-1353871 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-13538712022-08-10T20:25:29Zdoi:10.5170/CERN-2011-005.276http://cds.cern.ch/record/1353871engJowett, JBaudrenghien, PBruce, RCarli, CManglunki, DMertens, TWollmann, DHeavy Ions in 2011 and beyondAccelerators and Storage RingsThe LHC's first heavy ion run set - and tested - the operational pattern for 2011 and later years: a rapid commissioning strategy intended to ensure delivery of integrated luminosity despite the risks associated with the short time-frame. It also gave us hard data to test our understanding of the beam physics that will limit performance. The 2010 experience is fed into the commissioning plan, parameter choices and projected performance for 2011. The prospects for future stages of the LHC ion program, Pb-Pb collisions at higher energy and luminosity, hybrid collisions and other species, depend critically on the scheduling of certain hardware upgrades.oai:cds.cern.ch:13538712011 |
spellingShingle | Accelerators and Storage Rings Jowett, J Baudrenghien, P Bruce, R Carli, C Manglunki, D Mertens, T Wollmann, D Heavy Ions in 2011 and beyond |
title | Heavy Ions in 2011 and beyond |
title_full | Heavy Ions in 2011 and beyond |
title_fullStr | Heavy Ions in 2011 and beyond |
title_full_unstemmed | Heavy Ions in 2011 and beyond |
title_short | Heavy Ions in 2011 and beyond |
title_sort | heavy ions in 2011 and beyond |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.5170/CERN-2011-005.276 http://cds.cern.ch/record/1353871 |
work_keys_str_mv | AT jowettj heavyionsin2011andbeyond AT baudrenghienp heavyionsin2011andbeyond AT brucer heavyionsin2011andbeyond AT carlic heavyionsin2011andbeyond AT manglunkid heavyionsin2011andbeyond AT mertenst heavyionsin2011andbeyond AT wollmannd heavyionsin2011andbeyond |