EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop

The target hydraulic test will be carried out on IPUL (Latvia) mercury loop DN100. The loop will be adapted for the experiment on the basis of these technical requirements.

Detalles Bibliográficos
Autor principal: S.Dementjev, R.Milenkovic, and F.Groeschel
Lenguaje:eng
Publicado: 27/1
Materias:
Acceso en línea:http://cds.cern.ch/record/1355021
_version_ 1780922403869687808
author S.Dementjev, R.Milenkovic, and F.Groeschel
author_facet S.Dementjev, R.Milenkovic, and F.Groeschel
author_sort S.Dementjev, R.Milenkovic, and F.Groeschel
collection CERN
description The target hydraulic test will be carried out on IPUL (Latvia) mercury loop DN100. The loop will be adapted for the experiment on the basis of these technical requirements.
id cern-1355021
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 27/1
record_format invenio
spelling cern-13550212019-09-30T06:29:59Zhttp://cds.cern.ch/record/1355021engS.Dementjev, R.Milenkovic, and F.GroeschelEURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop2: TASK 2The target hydraulic test will be carried out on IPUL (Latvia) mercury loop DN100. The loop will be adapted for the experiment on the basis of these technical requirements.EURISOL-02-25-2008-0021oai:cds.cern.ch:135502127/11/08
spellingShingle 2: TASK 2
S.Dementjev, R.Milenkovic, and F.Groeschel
EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop
title EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop
title_full EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop
title_fullStr EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop
title_full_unstemmed EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop
title_short EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop
title_sort eurisol-ds metex1: hydraulic mercury test of the target mock-up. technical requirements on mercury loop
topic 2: TASK 2
url http://cds.cern.ch/record/1355021
work_keys_str_mv AT sdementjevrmilenkovicandfgroeschel eurisoldsmetex1hydraulicmercurytestofthetargetmockuptechnicalrequirementsonmercuryloop