EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop
The target hydraulic test will be carried out on IPUL (Latvia) mercury loop DN100. The loop will be adapted for the experiment on the basis of these technical requirements.
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
27/1
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1355021 |
_version_ | 1780922403869687808 |
---|---|
author | S.Dementjev, R.Milenkovic, and F.Groeschel |
author_facet | S.Dementjev, R.Milenkovic, and F.Groeschel |
author_sort | S.Dementjev, R.Milenkovic, and F.Groeschel |
collection | CERN |
description | The target hydraulic test will be carried out on IPUL (Latvia) mercury loop DN100. The loop will be adapted for the experiment on the basis of these technical requirements. |
id | cern-1355021 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 27/1 |
record_format | invenio |
spelling | cern-13550212019-09-30T06:29:59Zhttp://cds.cern.ch/record/1355021engS.Dementjev, R.Milenkovic, and F.GroeschelEURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop2: TASK 2The target hydraulic test will be carried out on IPUL (Latvia) mercury loop DN100. The loop will be adapted for the experiment on the basis of these technical requirements.EURISOL-02-25-2008-0021oai:cds.cern.ch:135502127/11/08 |
spellingShingle | 2: TASK 2 S.Dementjev, R.Milenkovic, and F.Groeschel EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop |
title | EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop |
title_full | EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop |
title_fullStr | EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop |
title_full_unstemmed | EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop |
title_short | EURISOL-DS METEX1: Hydraulic mercury test of the target mock-up. Technical requirements on mercury loop |
title_sort | eurisol-ds metex1: hydraulic mercury test of the target mock-up. technical requirements on mercury loop |
topic | 2: TASK 2 |
url | http://cds.cern.ch/record/1355021 |
work_keys_str_mv | AT sdementjevrmilenkovicandfgroeschel eurisoldsmetex1hydraulicmercurytestofthetargetmockuptechnicalrequirementsonmercuryloop |