Cargando…

EURISOL-DS Multi-MW Target: A safe way to run the CGS converter

This technical note summarizes the design calculations performed within Task#2 of the European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study (EURISOL-DS) on the safety hull of the CGS design of the mercury converter. A study was carried out in order to propose a configuration...

Descripción completa

Detalles Bibliográficos
Autor principal: Cyril Kharoua, Yacine Kadi, Karel Samec (CERN)
Lenguaje:eng
Publicado: 31/0
Materias:
Acceso en línea:http://cds.cern.ch/record/1355040
_version_ 1780922407336280064
author Cyril Kharoua, Yacine Kadi, Karel Samec (CERN)
author_facet Cyril Kharoua, Yacine Kadi, Karel Samec (CERN)
author_sort Cyril Kharoua, Yacine Kadi, Karel Samec (CERN)
collection CERN
description This technical note summarizes the design calculations performed within Task#2 of the European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study (EURISOL-DS) on the safety hull of the CGS design of the mercury converter. A study was carried out in order to propose a configuration for the safety hull and the connection between the target and the accelerator. The results of these calculations show a layout and a design proposal for the safety barrier of the EURISOL DS target design.
id cern-1355040
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 31/0
record_format invenio
spelling cern-13550402019-09-30T06:29:59Zhttp://cds.cern.ch/record/1355040engCyril Kharoua, Yacine Kadi, Karel Samec (CERN)EURISOL-DS Multi-MW Target: A safe way to run the CGS converter2: TASK 2This technical note summarizes the design calculations performed within Task#2 of the European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study (EURISOL-DS) on the safety hull of the CGS design of the mercury converter. A study was carried out in order to propose a configuration for the safety hull and the connection between the target and the accelerator. The results of these calculations show a layout and a design proposal for the safety barrier of the EURISOL DS target design.EURISOL-02-25-2009-0040oai:cds.cern.ch:135504031/07/09
spellingShingle 2: TASK 2
Cyril Kharoua, Yacine Kadi, Karel Samec (CERN)
EURISOL-DS Multi-MW Target: A safe way to run the CGS converter
title EURISOL-DS Multi-MW Target: A safe way to run the CGS converter
title_full EURISOL-DS Multi-MW Target: A safe way to run the CGS converter
title_fullStr EURISOL-DS Multi-MW Target: A safe way to run the CGS converter
title_full_unstemmed EURISOL-DS Multi-MW Target: A safe way to run the CGS converter
title_short EURISOL-DS Multi-MW Target: A safe way to run the CGS converter
title_sort eurisol-ds multi-mw target: a safe way to run the cgs converter
topic 2: TASK 2
url http://cds.cern.ch/record/1355040
work_keys_str_mv AT cyrilkharouayacinekadikarelsameccern eurisoldsmultimwtargetasafewaytorunthecgsconverter