EURISOL-DS Overall Design of the Multi-MW Target Station

The EURISOL Design Study investigated the feasibility of a complex instrument to push back the boundaries of current physics knowledge amidst today’s ever-increasing need for realism due to constraints imposed by safety, performance and, not least, budgetary responsibility.In order to attend to thes...

Descripción completa

Detalles Bibliográficos
Autor principal: Olivier Choisnet, Cyril Kharoua, Yacine Kadi, Karel Samec (CERN)
Lenguaje:eng
Publicado: 03/0
Materias:
Acceso en línea:http://cds.cern.ch/record/1355046
_version_ 1780922408425750528
author Olivier Choisnet, Cyril Kharoua, Yacine Kadi, Karel Samec (CERN)
author_facet Olivier Choisnet, Cyril Kharoua, Yacine Kadi, Karel Samec (CERN)
author_sort Olivier Choisnet, Cyril Kharoua, Yacine Kadi, Karel Samec (CERN)
collection CERN
description The EURISOL Design Study investigated the feasibility of a complex instrument to push back the boundaries of current physics knowledge amidst today’s ever-increasing need for realism due to constraints imposed by safety, performance and, not least, budgetary responsibility.In order to attend to these concerns, the EURISOL Multi-Megawatt converter target, its associated fission targets and the three 100 kW direct targets are all integrated into a single facility housing the ancillary equipment as well. The overall layout of the facility, its functional break-down and the main modes of operation are presented in the current report.
id cern-1355046
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 03/0
record_format invenio
spelling cern-13550462019-09-30T06:29:59Zhttp://cds.cern.ch/record/1355046engOlivier Choisnet, Cyril Kharoua, Yacine Kadi, Karel Samec (CERN)EURISOL-DS Overall Design of the Multi-MW Target Station2: TASK 2The EURISOL Design Study investigated the feasibility of a complex instrument to push back the boundaries of current physics knowledge amidst today’s ever-increasing need for realism due to constraints imposed by safety, performance and, not least, budgetary responsibility.In order to attend to these concerns, the EURISOL Multi-Megawatt converter target, its associated fission targets and the three 100 kW direct targets are all integrated into a single facility housing the ancillary equipment as well. The overall layout of the facility, its functional break-down and the main modes of operation are presented in the current report.EURISOL-02-25-2009-0046oai:cds.cern.ch:135504603/09/09
spellingShingle 2: TASK 2
Olivier Choisnet, Cyril Kharoua, Yacine Kadi, Karel Samec (CERN)
EURISOL-DS Overall Design of the Multi-MW Target Station
title EURISOL-DS Overall Design of the Multi-MW Target Station
title_full EURISOL-DS Overall Design of the Multi-MW Target Station
title_fullStr EURISOL-DS Overall Design of the Multi-MW Target Station
title_full_unstemmed EURISOL-DS Overall Design of the Multi-MW Target Station
title_short EURISOL-DS Overall Design of the Multi-MW Target Station
title_sort eurisol-ds overall design of the multi-mw target station
topic 2: TASK 2
url http://cds.cern.ch/record/1355046
work_keys_str_mv AT olivierchoisnetcyrilkharouayacinekadikarelsameccern eurisoldsoveralldesignofthemultimwtargetstation