Cargando…

Deliverable D5: The Multi-Megawatt Target Station (Final Report)

The Eurisol initiative seeks to develop an isotope production facility to provide the scientific community with the means to achieving high yields of isotopes and extending the variety of isotopes thus produced towards more exotic types rarely seen in existing facilities.The Multi-MW converter targe...

Descripción completa

Detalles Bibliográficos
Autor principal: Karel Samec et al. (CERN, IPUL, ITN, PSI)
Lenguaje:eng
Publicado: 03/0
Materias:
Acceso en línea:http://cds.cern.ch/record/1355048
_version_ 1780922408856715264
author Karel Samec et al. (CERN, IPUL, ITN, PSI)
author_facet Karel Samec et al. (CERN, IPUL, ITN, PSI)
author_sort Karel Samec et al. (CERN, IPUL, ITN, PSI)
collection CERN
description The Eurisol initiative seeks to develop an isotope production facility to provide the scientific community with the means to achieving high yields of isotopes and extending the variety of isotopes thus produced towards more exotic types rarely seen in existing facilities.The Multi-MW converter target at the heart of the projected facility is designed to create isotopes by fissioning uranium carbide (UC) target arranged coaxially around a 4 MW converter target. It is therefore essential that the target be as compact as possible to avoid losing neutrons to capture whilst maximising the neutron flux to enhance the number of fissions per second in the UC targets.The proposed ISOL facility would use both (a) several 100 kW proton beams on a thick solid target to produceRIBs directly, and (b) a liquid metal 4 MW ‘converter’ target to release high fluxes of spallation neutrons which would then produce RIBs by fission in a secondary uranium carbide (UCx) target. An alternative windowless liquid mercury-jet ‘converter’ target to generate the neutrons has also been proposed for this Multi-MW target station.
id cern-1355048
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 03/0
record_format invenio
spelling cern-13550482019-09-30T06:29:59Zhttp://cds.cern.ch/record/1355048engKarel Samec et al. (CERN, IPUL, ITN, PSI)Deliverable D5: The Multi-Megawatt Target Station (Final Report)2: TASK 2The Eurisol initiative seeks to develop an isotope production facility to provide the scientific community with the means to achieving high yields of isotopes and extending the variety of isotopes thus produced towards more exotic types rarely seen in existing facilities.The Multi-MW converter target at the heart of the projected facility is designed to create isotopes by fissioning uranium carbide (UC) target arranged coaxially around a 4 MW converter target. It is therefore essential that the target be as compact as possible to avoid losing neutrons to capture whilst maximising the neutron flux to enhance the number of fissions per second in the UC targets.The proposed ISOL facility would use both (a) several 100 kW proton beams on a thick solid target to produceRIBs directly, and (b) a liquid metal 4 MW ‘converter’ target to release high fluxes of spallation neutrons which would then produce RIBs by fission in a secondary uranium carbide (UCx) target. An alternative windowless liquid mercury-jet ‘converter’ target to generate the neutrons has also been proposed for this Multi-MW target station.EURISOL-02-25-2009-0048oai:cds.cern.ch:135504803/09/09
spellingShingle 2: TASK 2
Karel Samec et al. (CERN, IPUL, ITN, PSI)
Deliverable D5: The Multi-Megawatt Target Station (Final Report)
title Deliverable D5: The Multi-Megawatt Target Station (Final Report)
title_full Deliverable D5: The Multi-Megawatt Target Station (Final Report)
title_fullStr Deliverable D5: The Multi-Megawatt Target Station (Final Report)
title_full_unstemmed Deliverable D5: The Multi-Megawatt Target Station (Final Report)
title_short Deliverable D5: The Multi-Megawatt Target Station (Final Report)
title_sort deliverable d5: the multi-megawatt target station (final report)
topic 2: TASK 2
url http://cds.cern.ch/record/1355048
work_keys_str_mv AT karelsamecetalcernipulitnpsi deliverabled5themultimegawatttargetstationfinalreport