Cargando…

Optimization of 6He production using W or Ta converter surrounded by BeO target assembly

Optimization of the converter-BeO 2 step target for 6He production done on MCNPX. x5 gain factor is obtained for a final production of 1.1e14 6He/s with an incident 200kW, 2 GeV proton beam. Temperature profiles and BeO release properties are yet to be determined.

Detalles Bibliográficos
Autor principal: N. Thiollieres, J.C. David, V. Blideanu, D. Dore, B. Rapp, D. Ridikas
Lenguaje:eng
Publicado: 23/1
Materias:
Acceso en línea:http://cds.cern.ch/record/1355065
_version_ 1780922410361421824
author N. Thiollieres, J.C. David, V. Blideanu, D. Dore, B. Rapp, D. Ridikas
author_facet N. Thiollieres, J.C. David, V. Blideanu, D. Dore, B. Rapp, D. Ridikas
author_sort N. Thiollieres, J.C. David, V. Blideanu, D. Dore, B. Rapp, D. Ridikas
collection CERN
description Optimization of the converter-BeO 2 step target for 6He production done on MCNPX. x5 gain factor is obtained for a final production of 1.1e14 6He/s with an incident 200kW, 2 GeV proton beam. Temperature profiles and BeO release properties are yet to be determined.
id cern-1355065
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 23/1
record_format invenio
spelling cern-13550652019-09-30T06:29:59Zhttp://cds.cern.ch/record/1355065engN. Thiollieres, J.C. David, V. Blideanu, D. Dore, B. Rapp, D. RidikasOptimization of 6He production using W or Ta converter surrounded by BeO target assembly3: TASK 3Optimization of the converter-BeO 2 step target for 6He production done on MCNPX. x5 gain factor is obtained for a final production of 1.1e14 6He/s with an incident 200kW, 2 GeV proton beam. Temperature profiles and BeO release properties are yet to be determined.EURISOL-03-25-2006-0004oai:cds.cern.ch:135506523/10/06
spellingShingle 3: TASK 3
N. Thiollieres, J.C. David, V. Blideanu, D. Dore, B. Rapp, D. Ridikas
Optimization of 6He production using W or Ta converter surrounded by BeO target assembly
title Optimization of 6He production using W or Ta converter surrounded by BeO target assembly
title_full Optimization of 6He production using W or Ta converter surrounded by BeO target assembly
title_fullStr Optimization of 6He production using W or Ta converter surrounded by BeO target assembly
title_full_unstemmed Optimization of 6He production using W or Ta converter surrounded by BeO target assembly
title_short Optimization of 6He production using W or Ta converter surrounded by BeO target assembly
title_sort optimization of 6he production using w or ta converter surrounded by beo target assembly
topic 3: TASK 3
url http://cds.cern.ch/record/1355065
work_keys_str_mv AT nthiollieresjcdavidvblideanuddorebrappdridikas optimizationof6heproductionusingwortaconvertersurroundedbybeotargetassembly