Cargando…
Optimization of 6He production using W or Ta converter surrounded by BeO target assembly
Optimization of the converter-BeO 2 step target for 6He production done on MCNPX. x5 gain factor is obtained for a final production of 1.1e14 6He/s with an incident 200kW, 2 GeV proton beam. Temperature profiles and BeO release properties are yet to be determined.
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
23/1
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1355065 |
_version_ | 1780922410361421824 |
---|---|
author | N. Thiollieres, J.C. David, V. Blideanu, D. Dore, B. Rapp, D. Ridikas |
author_facet | N. Thiollieres, J.C. David, V. Blideanu, D. Dore, B. Rapp, D. Ridikas |
author_sort | N. Thiollieres, J.C. David, V. Blideanu, D. Dore, B. Rapp, D. Ridikas |
collection | CERN |
description | Optimization of the converter-BeO 2 step target for 6He production done on MCNPX. x5 gain factor is obtained for a final production of 1.1e14 6He/s with an incident 200kW, 2 GeV proton beam. Temperature profiles and BeO release properties are yet to be determined. |
id | cern-1355065 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 23/1 |
record_format | invenio |
spelling | cern-13550652019-09-30T06:29:59Zhttp://cds.cern.ch/record/1355065engN. Thiollieres, J.C. David, V. Blideanu, D. Dore, B. Rapp, D. RidikasOptimization of 6He production using W or Ta converter surrounded by BeO target assembly3: TASK 3Optimization of the converter-BeO 2 step target for 6He production done on MCNPX. x5 gain factor is obtained for a final production of 1.1e14 6He/s with an incident 200kW, 2 GeV proton beam. Temperature profiles and BeO release properties are yet to be determined.EURISOL-03-25-2006-0004oai:cds.cern.ch:135506523/10/06 |
spellingShingle | 3: TASK 3 N. Thiollieres, J.C. David, V. Blideanu, D. Dore, B. Rapp, D. Ridikas Optimization of 6He production using W or Ta converter surrounded by BeO target assembly |
title | Optimization of 6He production using W or Ta converter surrounded by BeO target assembly |
title_full | Optimization of 6He production using W or Ta converter surrounded by BeO target assembly |
title_fullStr | Optimization of 6He production using W or Ta converter surrounded by BeO target assembly |
title_full_unstemmed | Optimization of 6He production using W or Ta converter surrounded by BeO target assembly |
title_short | Optimization of 6He production using W or Ta converter surrounded by BeO target assembly |
title_sort | optimization of 6he production using w or ta converter surrounded by beo target assembly |
topic | 3: TASK 3 |
url | http://cds.cern.ch/record/1355065 |
work_keys_str_mv | AT nthiollieresjcdavidvblideanuddorebrappdridikas optimizationof6heproductionusingwortaconvertersurroundedbybeotargetassembly |