Cargando…
Optimization of 6He production using W or Ta converter surrounded by BeO target assembly
Optimization of the converter-BeO 2 step target for 6He production done on MCNPX. x5 gain factor is obtained for a final production of 1.1e14 6He/s with an incident 200kW, 2 GeV proton beam. Temperature profiles and BeO release properties are yet to be determined.
Autor principal: | N. Thiollieres, J.C. David, V. Blideanu, D. Dore, B. Rapp, D. Ridikas |
---|---|
Lenguaje: | eng |
Publicado: |
23/1
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1355065 |
Ejemplares similares
-
W converter - BeO dual target prototype for 6He production - a preliminary note
por: Stora, T, et al.
Publicado: (23/1) -
Feasibility study for the 100kW direct targets
por: T. Stora, J. Lettry, R. Catherall, E. Noah, R. Wilfinger, L. Penescu, E. Bouquerel, S. Fernandes, M. Santana-Leitner, L. Zanini, I. Guenter, F. Groeschel
Publicado: (23/1) -
Engineering aspects for the EURISOL 100kW liquid metal targets
por: E. Noah
Publicado: (10/0) -
Design and test of a two-body target unit for 100kW solid targets
por: E. Bouquerel, R. Catherall, J. Lettry, S. Marzari, E. Noah, L. Penescu, T. Stora, R. Wilfinger and the ISOLDE collaboration
Publicado: (07/0) -
Baseline parameters – 05/27/2005 Eurisol-DS task #3 “100kW direct target station”
por: Stora, T
Publicado: (23/0)