Cargando…

Splitting of high power, cw proton beams

A simple method for splitting a high power, continuous wave (cw) proton beam in two or more branches with low losses has been developed in the framework of the EURISOL (European Isotope Separation On-Line adioactive Ion Beam Facility) design study. The aim of the system is to deliver up to 4 MW of H...

Descripción completa

Detalles Bibliográficos
Autores principales: Facco, Alberto, Paparella, Rita, Berkovits, Dan, Yamane, Isao
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:http://cds.cern.ch/record/1355216
_version_ 1780922434787999744
author Facco, Alberto
Paparella, Rita
Berkovits, Dan
Yamane, Isao
author_facet Facco, Alberto
Paparella, Rita
Berkovits, Dan
Yamane, Isao
author_sort Facco, Alberto
collection CERN
description A simple method for splitting a high power, continuous wave (cw) proton beam in two or more branches with low losses has been developed in the framework of the EURISOL (European Isotope Separation On-Line adioactive Ion Beam Facility) design study. The aim of the system is to deliver up to 4 MW of H beam to the main radioactive ion beam production target, and up to 100 kWof proton beams to three more targets, simultaneously. A three-step method is used, which includes magnetic neutralization of a fractionof the main H- beam, magnetic splitting of H- and H0, and stripping of H0 to H+. The method allowsslow raising and individual fine adjustment of the beam intensity in each branch.
id cern-1355216
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-13552162019-09-30T06:29:59Zhttp://cds.cern.ch/record/1355216engFacco, AlbertoPaparella, RitaBerkovits, DanYamane, IsaoSplitting of high power, cw proton beams7: TASK 7A simple method for splitting a high power, continuous wave (cw) proton beam in two or more branches with low losses has been developed in the framework of the EURISOL (European Isotope Separation On-Line adioactive Ion Beam Facility) design study. The aim of the system is to deliver up to 4 MW of H beam to the main radioactive ion beam production target, and up to 100 kWof proton beams to three more targets, simultaneously. A three-step method is used, which includes magnetic neutralization of a fractionof the main H- beam, magnetic splitting of H- and H0, and stripping of H0 to H+. The method allowsslow raising and individual fine adjustment of the beam intensity in each branch.EURISOL-07-21-2007-0012oai:cds.cern.ch:13552162007
spellingShingle 7: TASK 7
Facco, Alberto
Paparella, Rita
Berkovits, Dan
Yamane, Isao
Splitting of high power, cw proton beams
title Splitting of high power, cw proton beams
title_full Splitting of high power, cw proton beams
title_fullStr Splitting of high power, cw proton beams
title_full_unstemmed Splitting of high power, cw proton beams
title_short Splitting of high power, cw proton beams
title_sort splitting of high power, cw proton beams
topic 7: TASK 7
url http://cds.cern.ch/record/1355216
work_keys_str_mv AT faccoalberto splittingofhighpowercwprotonbeams
AT paparellarita splittingofhighpowercwprotonbeams
AT berkovitsdan splittingofhighpowercwprotonbeams
AT yamaneisao splittingofhighpowercwprotonbeams